SEP 7 - Sequoia Trail

SEP 7 - Sequoia Trail

The Sept. 7th workday brought our Sequoia Trail work close enough to Semperviren Falls that we were able to attack it from two different directions: Heading uphill from the basin floor as we've been doing for the past eight months and jumping ahead to the staircase that connects the falls to the trail and somehow survived the 2020 CZU fires.  

AUG 10 - Sequoia Trail

AUG 10 - Sequoia Trail

The start of August marks the dog days of summer and the Trail Crew's first workday of the month on the 10th was appropriately warm, OK hot! We resumed work on Sequoia Trail less than five minutes from Sempervirens Falls and picked up where we left off in July. Half the crew continued the detail work on the previous workday's effort while the remainder of the crew plunged ahead to turn a very rough cut trail into something resembling a hiking trail. 

JUL 13 - Sequoia Trail

JUL 13 - Sequoia Trail

Since the CZU fires in 2020, we've watched the Ceanothus grow taller and thicker every season and wondered what impact it would have on future workdays. The short answer is to make the work even more difficult!  The Trail Crew's July 13th workday brought us to the stretch of Sequoia Trail between the old Wastahi Campground and Semperviren Falls and thickest Ceanothus we've encountered to date.

JUN 29 - Sequoia Trail

JUN 29 - Sequoia Trail

The June 29th workday was our first hot one of the summer, but fortunately it fell on what we decided would be a half workday due to the 'Art in the Park' special event. We also switched to our earlier summer start time which meant more time in the cool morning hours, so overall not too bad.

JUN 15 - Sequoia Trail

JUN 15 - Sequoia Trail

The Trail Crew's June 15th workday was a continuation of earlier work as we returned to the Sequoia Trail near the old Wastahi Campground on Sky Meadow Rd. The previous workday we had completed the initial rough cut that left us with a narrow corridor that resembled a game trail at best, so the goal this time was to expand on it by clearing the trail shoulder on both sides and then trimming the 6-8 foot high surrounding Ceanothus so it wasn't tall enough to droop onto the trail. 

JUN 1 - Sequoia Trail

JUN 1 - Sequoia Trail

Most Trail Crew workdays provide a sense of achievement as we begin the day with no sign of a trail anywhere thanks to the dense vegetation regrowth since the 2020 fires and by the end there is a walkable path through the forest that did not exist just hours before.  Our most recent workday was not one of those days.

MAY 18 - Sequoia Trail to Wastahi Campground

MAY 18 - Sequoia Trail to Wastahi Campground

The BBVTC's May 18th workday brought us to the end of the line in our initial effort on the Sequoia Trail, which in the pre-fire days was one of the most popular trails for Big Basin visitors. Beginning the work in mid-January, the initial goal was to rough cut the trail to the old Huckleberry Campground area, which park staff wants to reopen to visitor camping in spring-summer 2025, but just before the 18th we received updated instructions saying push-on to Wastahi!

APR 20 - Sequoia Trail

APR 20 - Sequoia Trail

Over the past year we've become accustomed to encountering increasingly dense vegetative regrowth, but the work on Sequoia is the thickest we've experienced as it sometimes requires getting down on hands and knees to determine the trail alignment we should be clearing. Over the past year we've become accustomed to encountering increasingly dense vegetative regrowth, but the work on Sequoia is the thickest we've experienced as it sometimes requires getting down on hands and knees to determine the trail alignment we should be clearing.